The Department of Facilities Planning & Management along with C.D. Smith construction began repairing the foundation on the northwest side of Johnston Hall. The sidewalk and the northwest entrance between Gesu and Johnston Hall will be closed between 8 a.m. and 5 p.m., Oct. 17 through Nov. 20, weather permitting.
During the repair, there will be excavation and heavy equipment operation in this area. Once the foundation is repaired, the treated area will remain open for the event of rain to make sure the repairs were successful. Every attempt will be made to leave the sidewalk and northeast entry open as much as possible.
Contact Glen Wilson with questions.